Head of the project: prof. Ing. Vičan Josef, CSc.
Research team: doc. Ing. Koteš Peter, PhD., Ing. Gocál Jozef, PhD., doc. Ing. Odrobiňák Jaroslav, PhD., doc. Ing. Brodňan Miroslav, PhD.
Duration: January 2016 – December 2018
orrect evaluation of existing bridges based on the objective reliability verification together with the economic calculation of effectiveness of their rehabilitation interventions introduces significant tool for objectification of decision making processes how to choose optimal method and time of the bridge rehabilitation. The project objective is to work up a study related to the problems of the concept of the bridge management system and to describe methods and methodology of the reliability evaluation of existing bridges from the viewpoint of nowadays reliability approaches based on the engineering theory of probability, mathematic statistics and probability theory.